{"id":59929,"date":"2026-04-21T12:14:03","date_gmt":"2026-04-21T10:14:03","guid":{"rendered":"https:\/\/eurotherm.eu\/?p=59929"},"modified":"2026-04-24T11:41:47","modified_gmt":"2026-04-24T09:41:47","slug":"a-complete-finishing-line-for-automated-picking-systems-for-textile-warehouses-and-industrial-laundries","status":"publish","type":"post","link":"https:\/\/eurotherm.eu\/en\/a-complete-finishing-line-for-automated-picking-systems-for-textile-warehouses-and-industrial-laundries\/","title":{"rendered":"A complete finishing line for automated picking systems for textile warehouses and industrial laundries"},"content":{"rendered":"\n<section  class=\"content-block overflow-hidden margin-big\" style=\"--color-animate-to: #181e25;\">\n    <div class=\"container-fluid\">\n        <div class=\"row\">\n                        <div class=\"col-lg-10 offset-lg-1\">\n                <div class=\"h1 colorating-text text-gray\"><p>Eurotherm is supporting Metalprogetti&#8217;s expansion into automated picking, with a complete plant for powder coating the metal organs of automated wardrobe management systems, storage, distribution and return of textile garments.<\/p>\n<\/div>\n                            <\/div>\n                    <\/div>\n    <\/div>\n<\/section><style>\n  \/* FIX: selettore corretto senza spazio extra *\/\n  .bordered-title.block-block_eb02bc88102aa3fa15fdf9501dd5caec::before {\n    background-color: #ffffff;\n  }\n<\/style>\n\n<section   class=\"section-wrapper wrapper margin-big\"\n  style=\"background-color: #181e25; --text-color: #ffffff;\">\n\n  <div class=\"container-fluid\">\n    <div class=\"row\">\n      <div class=\"col-lg-4\">\n                  <h2 style=\"color:var(--text-color);\" class=\"mb-5 bordered-title block-block_eb02bc88102aa3fa15fdf9501dd5caec\">\n            Impact\n          <\/h2>\n              <\/div>\n\n          <\/div>\n  <\/div>\n\n      <!-- layout standard -->\n    \n\n<section  class=\"case-block margin-big\">\n    <div class=\"container-fluid\">\n        <div class=\"row align-items-center mb-5\">\n            <div class=\"col-lg-6\" style=\"color:var(--text-color);\">\n                <h3>State-of-the-art facilities and process care: a common vision<\/h3>\n                <p><p>The installation taken care of by Eurotherm consists of a complete finishing plant for painting steel and aluminum components for use in automated equipment for industrial and dry cleaners, textile industries, and fashion companies.<\/p>\n<\/p>\n            <\/div>\n            <div class=\"col-lg-6\">\n                                    <img decoding=\"async\" src=\"https:\/\/eurotherm.eu\/wp-content\/uploads\/2026\/04\/2021-02-12-12.10.38-1-scaled.webp\" class=\"respimg rounded\" alt=\"Eurotherm\" title=\"Eurotherm\">\n                            <\/div>\n        <\/div>\n    <\/div>\n<\/section>\n\n\n<!-- double image text bottom -->\n<section  class=\"case-block margin-big\">\n    <div class=\"container-fluid\">\n        <div class=\"row mb-5\">\n            <div class=\"col-lg-6 order-2 order-lg-1\">\n                                    <div class=\"respimg-cont rounded mb-3\">\n                        <img decoding=\"async\" src=\"https:\/\/eurotherm.eu\/wp-content\/uploads\/2026\/04\/2021-03-12-11.21.37-1-scaled.webp\" alt=\"Eurotherm\" title=\"Eurotherm\">\n                    <\/div>\n                            <\/div>\n            <div class=\"col-lg-6 order-1 order-lg-2\" style=\"color:var(--text-color);\">\n                <h3><\/h3>\n                <p><p>The line consists of: pre-treatment tunnel, drying oven, powder coating booth, curing oven; and is designed to accommodate extremely variable productions in terms of dimensions, geometries and project requirements. Indeed, among the main strengths of the client company, Metalprogetti, are the modularity of the structures and the high degree of customization of the installation, in terms of both executive design and aesthetic finish. <\/p>\n<\/p>\n            <\/div>\n        <\/div>\n        <div class=\"row mb-5\">\n            <div class=\"col-lg-6\" style=\"color:var(--text-color);\">\n                <h3><\/h3>\n                <p><p>Powder coating of transport components is done by manual application inside ventilated booths, equipped with filtration and recovery systems to ensure the best process conditions and healthiness of the working environment.<\/p>\n<p>To achieve the project goal and ensure maximum production flexibility, Eurotherm, as the supplier of the plant technologies, participated in the definition and standardization of the processes, working closely with the client company and other project partners.<\/p>\n<\/p>\n            <\/div>\n            <div class=\"col-lg-6\">\n                                    <div class=\"respimg-cont rounded mb-3\">\n                        <img decoding=\"async\" src=\"https:\/\/eurotherm.eu\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-21-alle-11.41.43.webp\" class=\"respimg-cont rounded mb-3\" alt=\"Eurotherm\" title=\"Eurotherm\">\n                    <\/div>\n                            <\/div>\n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- double image text bottom -->\n<section  class=\"case-block margin-big\">\n    <div class=\"container-fluid\">\n        <div class=\"row mb-5\">\n            <div class=\"col-lg-6 order-2 order-lg-1\">\n                                    <div class=\"respimg-cont rounded mb-3\">\n                        <img decoding=\"async\" src=\"https:\/\/eurotherm.eu\/wp-content\/uploads\/2026\/04\/2021-03-11-14.26.03-1-scaled.webp\" alt=\"Eurotherm\" title=\"Eurotherm\">\n                    <\/div>\n                            <\/div>\n            <div class=\"col-lg-6 order-1 order-lg-2\" style=\"color:var(--text-color);\">\n                <h3><p>Pretreatment: the seamless integration of technology and chemistry<\/p>\n<\/h3>\n                <p><p>Pretreatment of metal fabrications takes place as part of a multistage process that includes:<\/p>\n<ul>\n<li>Phosphodecapping, with products formulated on demand to solve one of the main critical process issues, namely foaming in the phosphating stage caused by the presence of surfactants;<\/li>\n<li>2 rinses with tap water;<\/li>\n<li>Rinsing with osmotized water, obtained from the primary water treatment plant thanks to the membrane with ion exchange resins, which transforms mains water into osmotized water, suitable for both rinsing and preparation of the nanotechnological solution for passivation;<\/li>\n<li>Nanotechnological no rinse passivation, with Qualicoat and Qualicoatsteel certified product, guaranteeing the quality of treatments on steel, galvanized steel and aluminum.<\/li>\n<\/ul>\n<p>For the environmentally friendly management of process waste, the pretreatment tunnel is equipped with different types of filters: from coarse filters for major impurities to activated carbon filters capable of removing particles down to one micron.<\/p>\n<\/p>\n            <\/div>\n        <\/div>\n        <div class=\"row mb-5\">\n            <div class=\"col-lg-6\" style=\"color:var(--text-color);\">\n                <h3><p>Overhead part transport system, operational flexibility and organized management of batches to be painted<\/p>\n<\/h3>\n                <p><p>The semi-automatic overhead conveyor has been designed and manufactured in compliance with the main requirement of the specifications, namely, the ability to handle and move loads with varying bulk and weight.<\/p>\n<\/p>\n            <\/div>\n            <div class=\"col-lg-6\">\n                                    <div class=\"respimg-cont rounded mb-3\">\n                        <img decoding=\"async\" src=\"https:\/\/eurotherm.eu\/wp-content\/uploads\/2026\/04\/2021-02-12-12.12.48-1-scaled.webp\" class=\"respimg-cont rounded mb-3\" alt=\"Eurotherm\" title=\"Eurotherm\">\n                    <\/div>\n                            <\/div>\n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- double image text bottom -->\n<section  class=\"case-block margin-big\">\n    <div class=\"container-fluid\">\n        <div class=\"row mb-5\">\n            <div class=\"col-lg-6 order-2 order-lg-1\">\n                                    <div class=\"respimg-cont rounded mb-3\">\n                        <img decoding=\"async\" src=\"https:\/\/eurotherm.eu\/wp-content\/uploads\/2026\/04\/2021-03-11-18.24.15-1-scaled.webp\" alt=\"Eurotherm\" title=\"Eurotherm\">\n                    <\/div>\n                            <\/div>\n            <div class=\"col-lg-6 order-1 order-lg-2\" style=\"color:var(--text-color);\">\n                <h3><p>Preventive maintenance as a growth factor<\/p>\n<\/h3>\n                <p><p>In the construction of the new paint plant for Metalprogetti, special attention was paid to the definition of preventive maintenance practices, aimed at ensuring operational continuity, reducing downtime and preserving the safety of employees on the line.<\/p>\n<\/p>\n            <\/div>\n        <\/div>\n        <div class=\"row mb-5\">\n            <div class=\"col-lg-6\" style=\"color:var(--text-color);\">\n                <h3><\/h3>\n                <p><\/p>\n            <\/div>\n            <div class=\"col-lg-6\">\n                            <\/div>\n        <\/div>\n    <\/div>\n<\/section>\n\n  \n<\/section>\n<section class=\"content-block overflow-hidden mt-5\"><div class=\"container-fluid\"><div class=\"author-box-wrap\"><div class=\"wp-block-post-author\"><div class=\"wp-block-post-author__content\"><p class=\"wp-block-post-author__name\">Eurotherm Editorial Office<\/p><\/div><\/div><\/div><\/div><\/section><section class=\"content-block overflow-hidden mb-3\"><div class=\"container-fluid\"><div class=\"author-box-wrap\"><div class=\"wp-block-post-author-biography\">The Eurotherm Editorial Office is responsible for drafting and publishing the company\u2019s technical and institutional content. It supervises all articles to ensure consistency, clarity, and continuous updates, working closely with the engineering and production departments. Each text is carefully reviewed to guarantee informational quality and provide added value to professional readers in the sector.<\/div><\/div><\/div><\/section>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":5,"featured_media":59928,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[205],"tags":[368,367,350],"class_list":["post-59929","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies","tag-general-production","tag-iron","tag-powder-coating-3"],"acf":[],"_links":{"self":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts\/59929","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/comments?post=59929"}],"version-history":[{"count":1,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts\/59929\/revisions"}],"predecessor-version":[{"id":59930,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts\/59929\/revisions\/59930"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/media\/59928"}],"wp:attachment":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/media?parent=59929"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/categories?post=59929"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/tags?post=59929"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}