{"id":50475,"date":"2023-01-05T19:05:47","date_gmt":"2023-01-05T18:05:47","guid":{"rendered":"https:\/\/eurotherm.eu\/coating-system-with-integrated-lift-station\/"},"modified":"2025-06-13T15:46:36","modified_gmt":"2025-06-13T13:46:36","slug":"coating-system-with-integrated-lift-station","status":"publish","type":"post","link":"https:\/\/eurotherm.eu\/en\/coating-system-with-integrated-lift-station\/","title":{"rendered":"Coating system with integrated lift station inside the spray booth"},"content":{"rendered":"<p><br \/>\nWhen we say we build coating systems that are completely tailor-made, we are not joking: our aim has always been to understand what the company&#8217;s current (and often future) needs are, as well as to find innovative solutions to:<\/p>\n<ul>\n<li><strong>Optimise the company&#8217;s production cycles.<\/strong><\/li>\n<li><strong>Achieve quality painting.<\/strong><\/li>\n<\/ul>\n<p><\/p>\n<div class=\"swiper-gallery-dida\">\n<div class=\"swiper-wrapper\">\n<div class=\"swiper-slide\">\n<div class=\"respimg-cont\"><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/eurotherm.eu\/wp-content\/uploads\/2023\/01\/Powder-painting-booth-with-lifting-station-3-773x1030.jpg\" alt=\"Eurotherm\" title=\"Eurotherm\"><\/div>\n<\/div>\n<div class=\"swiper-slide\">\n<div class=\"respimg-cont\"><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/eurotherm.eu\/wp-content\/uploads\/2023\/01\/Powder-painting-booth-with-lifting-station-1-773x1030.jpg\" alt=\"Eurotherm\" title=\"Eurotherm\"><\/div>\n<\/div>\n<div class=\"swiper-slide\">\n<div class=\"respimg-cont\"><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/eurotherm.eu\/wp-content\/uploads\/2023\/01\/Powder-painting-booth-with-lifting-station-2-773x1030.jpg\" alt=\"Eurotherm\" title=\"Eurotherm\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<p><br \/>\nIn this case, the powder coating system &#8211; in order to be truly optimal for the customer &#8211; needed to feature a <b>permanent lift station inside the spray booth<\/b>.<\/p>\n<p>The customer&#8217;s priority was in fact directed in three directions:<\/p>\n<ul>\n<li>on the one hand, they needed a <b>powder coating that was aesthetically in line with the aesthetic standards<\/b> demanded by today\u2019s market,<\/li>\n<li>on the other hand, they wanted to increase the <b>safety and ergonomics of the working environment for the painting workers<\/b>.<\/li>\n<li>They also wished to <b>speed up the painting process<\/b>.<\/li>\n<\/ul>\n<p><b>Freedom of movement, automation and speed<\/b> were the three key words that led to the need of creating a painting system with the addition of a lifting station inside the spray booth.<\/p>\n<p>This made it possible for the operator to easily reach all parts of the machinery to be treated <b>in total safety and without the aid of ladders or inherently dangerous elevated platforms<\/b>.<br \/>\n<\/p>\n<p>[av_codeblock wrapper_element=&#8221; wrapper_element_attributes=&#8221; codeblock_type=&#8221; alb_description=&#8221; id=&#8221; custom_class=&#8221; template_class=&#8221; av_uid=&#8217;av-lcuwmc2l&#8217; sc_version=&#8217;1.0&#8242;]<br \/>\n<video style=\"height: 400px; background: #000000;\" autoplay=\"autoplay\" muted=\"\" controls=\"controls\" width=\"300\" height=\"150\"><source src=\"https:\/\/eurotherm.eu\/wp-content\/uploads\/2023\/01\/noAudio-Powder-painting-booth-with-lifting-station.mp4\" type=\"video\/mp4\" \/>Your browser does not support the video tag.<\/video><br \/>\n[\/av_codeblock]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>When we say we build coating systems that are completely tailor-made, we are not joking: our aim has always been to understand what the company&#8217;s current (and often future) needs are, as well as to find innovative solutions to: Optimise the company&#8217;s production cycles. Achieve quality painting. In this case, the powder coating system &#8211; [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":18052,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[214],"tags":[],"class_list":["post-50475","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-installations"],"acf":[],"_links":{"self":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts\/50475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/comments?post=50475"}],"version-history":[{"count":1,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts\/50475\/revisions"}],"predecessor-version":[{"id":51815,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts\/50475\/revisions\/51815"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/media\/18052"}],"wp:attachment":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/media?parent=50475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/categories?post=50475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/tags?post=50475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}