{"id":50332,"date":"2021-05-28T07:40:41","date_gmt":"2021-05-28T05:40:41","guid":{"rendered":"https:\/\/eurotherm.eu\/automatic-oven-for-a-step-by-step-line\/"},"modified":"2025-06-13T15:45:25","modified_gmt":"2025-06-13T13:45:25","slug":"automatic-oven-for-a-step-by-step-line","status":"publish","type":"post","link":"https:\/\/eurotherm.eu\/en\/automatic-oven-for-a-step-by-step-line\/","title":{"rendered":"Automatic Oven for a step-by-step line"},"content":{"rendered":"\n<p><span style=\"font-size: medium;\"><span lang=\"en-GB\">A made to measure oven, for the evaporation of the processing oil on parts, completely automated with conveyor belt for step-by-step movement of the pieces in three steps and consisting of 3 distinct zones:<\/span><\/span><\/p>\n<ol>\n<li><span style=\"font-size: medium;\"><span lang=\"en-GB\">First area for the evaporation at room temperature of processing oil, built in pre-insulated sandwich panels with forced air intake and automatic rolling doors<\/span><\/span><\/li>\n<li><span style=\"font-size: medium;\"><span lang=\"en-GB\">Curing chamber at 200 \u00b0 C for oil evaporation, with an air recirculation system, suction filters and vapor extraction; Consisting of galvanized steel panels with a 150mm rock wool insulation, gas burner and two painted galvanized guillotine automatic doors again with 150mm internal insulation.<\/span><\/span><\/li>\n<li><span style=\"font-size: medium;\"><span lang=\"en-GB\">Post cooling chamber and residual steam disposal, consisting of pre-insulated sandwich panels with forced air intake and automatic rolling doors.<\/span><\/span><\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>A made to measure oven, for the evaporation of the processing oil on parts, completely automated with conveyor belt for step-by-step movement of the pieces in three steps and consisting of 3 distinct zones: First area for the evaporation at room temperature of processing oil, built in pre-insulated sandwich panels with forced air intake and [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":12746,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[214],"tags":[],"class_list":["post-50332","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-installations"],"acf":[],"_links":{"self":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts\/50332","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/comments?post=50332"}],"version-history":[{"count":1,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts\/50332\/revisions"}],"predecessor-version":[{"id":51667,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/posts\/50332\/revisions\/51667"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/media\/12746"}],"wp:attachment":[{"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/media?parent=50332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/categories?post=50332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eurotherm.eu\/en\/wp-json\/wp\/v2\/tags?post=50332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}